Molding trial

Molding trial


When filling a new or unfamiliar mold for the first time, where shot size for that mold is unknown, a technician/tool setter usually starts with a small shot weight and fills gradually until the mold is 95 to 99% full. Once this is achieved a small amount of holding pressure will be applied and holding time increased until gate freeze off (solidification time) has occurred. Gate solidification time is an important as it determines cycle time, which itself is an important issue in the economics of the production process.[36] Holding pressure is increased until the parts are free of sinks and part weight has been achieved. Once the parts are good enough and have passed any specific criteria, a setting sheet is produced for people to follow in the future. The method to setup an unknown mold the first time can be supported by installing cavity pressure sensors. To see how much the cavities are filled the pressure in the cavity gives a good indication for. Once the mold is set up the first time modern monitoring systems can save a reference curve of the cavity pressure. With that it is possible to reproduce the same part quality on another molding machine within a short setup time.

New Up Date

Manufacturing Idea © 2008 Template by Dicas Blogger.

TOPO